Rldev
Member
I have had to adjust my clack ws-1 settings due to changes in my local water supply. My question is about metered regeneration. My valve is set for metered regeneration. I have set a 14 day override. The override will never be invoked in my system. The other day while working in the same room as the softener, the regen cycle turned on and I was a little startled. I have been monitoring usage after my changes and capacity was low. In my head, I was thinking that even in metered mode, the system would regenerate at the next 2:00AM set time. Is this an option on the WS-1? It's not a big deal, but it would be better if the regen took place at 2:00am next day once a certain capacity has been reached. Hopefully I'm making sense. Thanks.