Users who are viewing this thread

Katehis24

New Member
Messages
1
Reaction score
0
Points
1
Location
Long Island, NY
Hey guys, I'm redoing the plumbing in the basement bathroom since it was never vented properly. I cut all the existing pipes out. I re-connected a new 3-inch pvc into the existing 3 in pvc that led to the stack that goes to the street.

I would like to know if everything is up to code for NY, specifically Long Island. Nothing is glued yet, and the pitch of the pipes is already close to the 1/4" per foot.
 

Attachments

  • IMG_1738.jpg
    IMG_1738.jpg
    113.4 KB · Views: 261
Top