I want to replace galvanized pipes with PEX. I understand that the PEX should not be stressed at the point of connection, like to a hose bibb. What about to stop valves that supply water to fixtures? What is the norm to connecting PEX to stop valves at fixtures and to shower heads, etc?
For example: Regarding shower/tub system, are the shower systems (thermal balancing valves, shower heads, etc.) connected via copper pipes and the PEX is only connected as a supply to the copper circuit? I find this confusing because I thought one advantage of PEX is not needing to open a wall to access the plumbing....
Thanks,
For example: Regarding shower/tub system, are the shower systems (thermal balancing valves, shower heads, etc.) connected via copper pipes and the PEX is only connected as a supply to the copper circuit? I find this confusing because I thought one advantage of PEX is not needing to open a wall to access the plumbing....
Thanks,