Which "schedule" PVC would ya'll recommend for a burried run to and from an above ground water storage tank/cistern? It would be from the well to the storage tank, then from storage tank to a pressure tank then to the house. I think the inlet is 1 1/2" and the outlet is 2". Not sure if I am going to go with a jet pump or an in tank sub. pump yet. The pump,(if I go with a jet pump), would be out at the tank not inside the house, so noise shouldn't be big problem.