Trying to plan the drain for the clothes washer. Our code is 2012 ipc. I’m trying to keep the trap within the one stud bay since they are 2x4 and I need a 2” pipe. I have about 6-7 inches behind the 2x4 wall that I could use that space.
Could I sani-t back towards the space behind the studs and turn the trap portion forward into the stud bay and stub up for the washer box?
I can maybe get a better photo tomorrow to help explain. Ideas?
Could I sani-t back towards the space behind the studs and turn the trap portion forward into the stud bay and stub up for the washer box?
I can maybe get a better photo tomorrow to help explain. Ideas?