RubiksKewb
New Member
Putting in shower pre-slope and when it was dry it was low on one side to the point of being almost level. If I add acrylic bonding agent to the drypack can I get away with raising it ½ an inch? Would I want to use more thinset between layers? Is there another option for raising one side a little bit or should I just dig it out?