dynetteduckie
New Member
Hi! I currently have a bathroom that needs to at least be retiled, but I want to make the juice worth the squeeze and kinda wanna just go all in. I have attached my current situation and my new idea. None of the walls are load bearing but I am very nervous to redo the plumbing and drainage. The new layout is the one with the tub, shower, and double vanity on the left wall. As you can see I want to move the shower, bathtub, and make a double vanity. Can I move a dry vent to the new double vanity and then wet vent the rest of it? I have a crawl space, everything as it is now is connected to the main toilet pipe which is I guess how it should be connected in the future. The room dimensions are 15’ x 9’ And the toilet is 18” from the wall. Please know my little drawings are not to scale haha!