I recently had a contractor convert a sunken tub into an ADA curbless shower. When the tub was pulled, there was a hole in the slab and the dirt was exposed. The work on the floor was done, I think the contractor simply filled the dirt area with concrete. Is there a code requiring an access box of some sort? My shower P trap is now clogged with something resembling concrete, but thinking of jack-hammering the new tile floor to gain access has me wondering if he filled the dirt area with concrete, I might have 12" of concrete to hammer through to gain access to the P trap for replacement. I would prefer this be on his nickel, not mine.
Any thoughts?