Hi. We are ripping out a full bathroom on the first floor of our home, which will become part of our kitchen and will eventually contain a new sink and d/w. We are also planning to put a new half-bath in an adjacent closet. We will hire a plumber to rough out the new plumbing. However, my wife and I are doing the demo ourselves to save money, and need to remove the plumbing in order to complete our demo of the walls and removal of the bathtub (an old cast iron behemoth).
I know how to remove the fixtures themselves, but I do not have any experience with removing and capping the pipes. There is access to all of the piping from the basement so I am hoping this should make the project easier. I was hoping that someone could give us some guidance on this project!
The supply pipes are brass (circa 1940) and are about 1" in outer diameter, and most do not have working supply valves. My thought was that I can cut each pipe in the basement with a sawzall and then remove it from the nearest fitting (typically a 90 elbow), and then replace it with some sort of a cap fitting from my local plumbing supply. Are there any specific issues I should be aware of when working with brass pipe, or is there some other procedure (such as a compression fitting) that I should use?
The drain lines are galvanized and are about 1 3/4" in outer diameter. I was thinking that I could cut these in the basement with a sawzall as well, and then stuff them with a cloth and leave them for the plumber to deal with when he ties in the new drain lines (in about 2-3 months)? Or is there a reason that I need to formally cap them off?
And how about the vent line? Can I also just cut the branch vent and stuff it with something for now? I am not even sure if there is anything on upper floors that is tied to this vent -- I am pretty sure there is not but I'm not sure how to confirm this is the case (without busting open some walls).
Any thoughts or advice, or issues that I should be concerned about, would be much appreciated! Please let me know if you need any more information in order to answer.
I know how to remove the fixtures themselves, but I do not have any experience with removing and capping the pipes. There is access to all of the piping from the basement so I am hoping this should make the project easier. I was hoping that someone could give us some guidance on this project!
The supply pipes are brass (circa 1940) and are about 1" in outer diameter, and most do not have working supply valves. My thought was that I can cut each pipe in the basement with a sawzall and then remove it from the nearest fitting (typically a 90 elbow), and then replace it with some sort of a cap fitting from my local plumbing supply. Are there any specific issues I should be aware of when working with brass pipe, or is there some other procedure (such as a compression fitting) that I should use?
The drain lines are galvanized and are about 1 3/4" in outer diameter. I was thinking that I could cut these in the basement with a sawzall as well, and then stuff them with a cloth and leave them for the plumber to deal with when he ties in the new drain lines (in about 2-3 months)? Or is there a reason that I need to formally cap them off?
And how about the vent line? Can I also just cut the branch vent and stuff it with something for now? I am not even sure if there is anything on upper floors that is tied to this vent -- I am pretty sure there is not but I'm not sure how to confirm this is the case (without busting open some walls).
Any thoughts or advice, or issues that I should be concerned about, would be much appreciated! Please let me know if you need any more information in order to answer.