I'm changing a tub/shower to an all tile shower. I have my mud mix, liner, sealant, concrete, and a plan.
I've removed the tub to find the 1 1/2" drain pipe.
I understand that I have to move the drain to the center and build 2" to the existing trap to meet Phoenix code.
Question:
Do I need to remove the old trap and put it directly under the relocated shower drain? Or can I run new 2" to the existing trap under the old tub drain? If the trap is 1 1/2" do I have to replace it. I know these are code questions, but there may be industry wide standards I should be following.
Here's the picture of what I have now.
Thanx for your tips and advice.
Mark
I've removed the tub to find the 1 1/2" drain pipe.
I understand that I have to move the drain to the center and build 2" to the existing trap to meet Phoenix code.
Question:
Do I need to remove the old trap and put it directly under the relocated shower drain? Or can I run new 2" to the existing trap under the old tub drain? If the trap is 1 1/2" do I have to replace it. I know these are code questions, but there may be industry wide standards I should be following.
Here's the picture of what I have now.
Thanx for your tips and advice.
Mark