Pghsebring
DIY Member
Redoing a bathroom...here's what i want to do.
Eventually we will be finishing the basement below the bathroom. I want to run the tub/shower drain between (parallel) the floor joists so that no part hangs down below the joists (2x10s). After about 6 ft, i want to run the drain just underneath the joists about for about 6' more until it ties in with the main stack against a wall. I want to do this so i can put the drain in a soffit with some other pipes, etc, and not have to drill a ton of holes in a ton of joists.
How do i go about making the transition from between the joists running parallel, to under the joists running perpendicular? Do i just get a couple of long sweep 90s? Some 45s? Is this even possible?
Thanks in advance.
Eventually we will be finishing the basement below the bathroom. I want to run the tub/shower drain between (parallel) the floor joists so that no part hangs down below the joists (2x10s). After about 6 ft, i want to run the drain just underneath the joists about for about 6' more until it ties in with the main stack against a wall. I want to do this so i can put the drain in a soffit with some other pipes, etc, and not have to drill a ton of holes in a ton of joists.
How do i go about making the transition from between the joists running parallel, to under the joists running perpendicular? Do i just get a couple of long sweep 90s? Some 45s? Is this even possible?
Thanks in advance.