josephcraw
New Member
I just had a well dug and my driller is pushing me to use schedule 80 pipe. I would prefer to use poly but he's telling me that the pump vibration and startup jerk can cause the fitting to fall out of the end of the pipe. I've spoken to other drillers in my area and while they too prefer 80 they had never heard of a pump vibrating out of poly. He says he'll do whatever I want. Have other people heard of this? Should I go with the poly? I'm not very keen on the pvc being a hippie and all. Thanks