Hi Everyone,
I have taken up a project that involves adding a Shower to my Basement which has concrete floor we had half Bath, I have removed the walls around it and vanity currently am at a point where have to break up concrete floor to connect a 2" PVC pipe for the shower to one of the following points and need help.
I have a pit with up flushing toilet as the Sewer line is above the concrete floor level.
1. Break concrete 8 foot long 4 " Deep to the pit
or
2. Break Concrete 2 Foot long 4" deep to a PCV Stack 4" behind the toilet this is used as a vent I think as one end leads to the roof and the other to the pit.
if I go for the near location how do I cut a 2" hole in the stack to connect the 2" PVC pipe to the bath ? is this the correct approch ?
Trap will be installed at the shower end if thats OK.
thank you
Manish
I have taken up a project that involves adding a Shower to my Basement which has concrete floor we had half Bath, I have removed the walls around it and vanity currently am at a point where have to break up concrete floor to connect a 2" PVC pipe for the shower to one of the following points and need help.
I have a pit with up flushing toilet as the Sewer line is above the concrete floor level.
1. Break concrete 8 foot long 4 " Deep to the pit
or
2. Break Concrete 2 Foot long 4" deep to a PCV Stack 4" behind the toilet this is used as a vent I think as one end leads to the roof and the other to the pit.
if I go for the near location how do I cut a 2" hole in the stack to connect the 2" PVC pipe to the bath ? is this the correct approch ?
Trap will be installed at the shower end if thats OK.
thank you
Manish