OK first, I don't expect anyone to fully understand this system. I was just wondering if this could be done, and if it would help the water pressure.
In bath #3 (pic) I have no water pressure in the shower, even though it was just remodeled. (NO, I didn't do the work myself, but this is part of the reason I am doing the one above). So the copper goes from bath 3 up to bath 5. I am running 3/4 Pex homerun to bath 5; I was wondering if I connected the pex to the open copper pipe that was feeding bath 5. It feeds bath 3 first. Would give me more pressure. Bath 3 would be feed from two ends. It would make a loop
Main------1/2" copper-----bath 3
Main-------3/4 pex------bath 5-------bath 3
I can get to the copper pipe in bath 3 now. Once I close up bath 5, I can't.
I can't replumb bath 3, I can only just get to the cut pipe from where it was feeding bath 5.
In bath #3 (pic) I have no water pressure in the shower, even though it was just remodeled. (NO, I didn't do the work myself, but this is part of the reason I am doing the one above). So the copper goes from bath 3 up to bath 5. I am running 3/4 Pex homerun to bath 5; I was wondering if I connected the pex to the open copper pipe that was feeding bath 5. It feeds bath 3 first. Would give me more pressure. Bath 3 would be feed from two ends. It would make a loop
Main------1/2" copper-----bath 3
Main-------3/4 pex------bath 5-------bath 3
I can get to the copper pipe in bath 3 now. Once I close up bath 5, I can't.
I can't replumb bath 3, I can only just get to the cut pipe from where it was feeding bath 5.