While maybe not common, there are places where you need TWO PRVs, plumbed in series to drop the pressure to an acceptable level. So, if it was REALLY high, the utility might get it down to very high, then let you deal with it to drop it further, if needed. There's a limit on how much a prv can drop the pressure.