steveandvi
New Member
I purchased a property with a pole barn that was under construction. The existing well/pump use to feed a double wide that no longer present. This end of the pipe was capped with a faucet. It appears the prior owner ran a new under ground pipe from the well to the pole barn by teeing into the existing underground line. This new line was to feed a Bladder tank located in the pole barn to supply water to hot water heater and bathroom.
1) Will this system work properly with a check valve at the bladder tank. It would think the check valve would prevent a pressure drop at the switch if the out side valve was turned on.
2) should I dig up the Tee and eliminate the exterior faucet and re-plumb after the bladder tank?
1) Will this system work properly with a check valve at the bladder tank. It would think the check valve would prevent a pressure drop at the switch if the out side valve was turned on.
2) should I dig up the Tee and eliminate the exterior faucet and re-plumb after the bladder tank?