Well I have most of the demo done.
What I am thinking of doing to fix my main stack code problem is to add some wood to the current 2x4 construction behind the toilet. One I bump it out to 2x6, I will use 2 45* PVC pipes to move the stack into the wall then run it strait up out of the roof. Once the stack is above the ceiling I will tie in the vents for the shower and sink.
Due to the fact I will have to bump the wall out, I will lose my 12" rough in for the toilet. So I will just install a 10" toilet.
ATM, this seems to be the easiest fix for all my stack/vent issues.
Anyone see any problems with this?