I'm putting a dual vanity where there was only a single and moving my toilet and tub/shower in my upstairs bathroom. While I'm doing all that I'm just replacing all the Polybutylene pipe with copper.
Is attached a primitive map of the current plumbing. The thicker lines are 3/4" pipe and the thinner ones are 1/2". I guess I'm surprised that the hot water line for both showers is just a 1/2" pipe. Is this correct or should I run 3/4" supply over there and then T off to two 1/2" lines?
Thanks for any help you all can offer!
- Jeremy
Is attached a primitive map of the current plumbing. The thicker lines are 3/4" pipe and the thinner ones are 1/2". I guess I'm surprised that the hot water line for both showers is just a 1/2" pipe. Is this correct or should I run 3/4" supply over there and then T off to two 1/2" lines?
Thanks for any help you all can offer!
- Jeremy