I am planning the rough in for a small bathroom install on a concrete slab for a friend. This bathroom will include a walk in tub with a 2 inch drain assembly already installed. I am trying to lessen the time it takes for this tub to drain. I am thinking of using a 3 inch p trap with a 3 inch drain (vented of course). Would this speed up the draining time? and what about the code situation?