Joeriley2005
New Member
Is it acceptable in WA to use the existing threaded cleanout at the end of a DWV run to add my new DWV line for an added bathroom? I would add a new cleanout after the connection. Can I just thread in a new coupling and attach my pipe or do I have to removed the threaded connection completely?
Thanks,
Joe
Thanks,
Joe