randym
New Member
I have dug my basement deeper and will have a toilet connecting to a 4†pvc sewer line under the slab that runs 45’ to an ejector pit. I know the current rough-in does not meet code but, assuming it passes inspection, I am wondering if it is good enough as my contractor claims. On average the slope of the line is almost precisely ¼†per foot, but the slope varies. The first 10’ is 0.17†per foot, the next 6’ that is between two 45 degree turns is 0.41†per foot, the next 24’ is 0.27†per foot, and the last 5’ into the pit that begins with a 25 degree turn is 0.11†per foot.
A drawing is attached.
Should I insist that it be redone?
Thanks.