Hello...i'm a recent DIY-er (unfinished basement)
To meet code, I replaced a 1.5" standpipe with a 2" standpipe (ruff-in). I also relocated the p-trap.
My 2" ruff-in Standpipe is out of plump in one plane. It's also ~1" to the left of where I intended it to be.
I plan to create a mortar bed.
From the pictures, do you think I'm too out of plumb?
Ideally, I would like to cut the main drain pipe in the slab and start all over. However, I don't have enough length or purchase with the drain pipe without have to do more jack hammering...which I'm trying to avoid.
Thanks
To meet code, I replaced a 1.5" standpipe with a 2" standpipe (ruff-in). I also relocated the p-trap.
My 2" ruff-in Standpipe is out of plump in one plane. It's also ~1" to the left of where I intended it to be.
I plan to create a mortar bed.
From the pictures, do you think I'm too out of plumb?
Ideally, I would like to cut the main drain pipe in the slab and start all over. However, I don't have enough length or purchase with the drain pipe without have to do more jack hammering...which I'm trying to avoid.
Thanks