tjrobinson
New Member
I am trying to transition my tub to a shower pan only. To do that I need to switch the drain and vent connections through a wye. The drain portions are 2" and the vent is 1.5". The vent continues from the drawing to a wall then goes vetical through the wall. Is there any problems with my proposal?