I am going to install a new sand point next spring. I would like to have it burried below the frost line and have the 1 1/4" pipe trenched until it could be pulled into my crawl space. I will be installing a check valve under the premise so it could be easily serviced rather than have it in the ground. I am on the correct path and any recomendations would be appreciated.
Also would like to know about encasing the sand point and piping in an ABS pipe. Someone told me it slows down the wear factor on the point and the coupling joints. It would also be easier to pull it out should it need service. Is this a good idea and how is it done? Thank you.
Also would like to know about encasing the sand point and piping in an ABS pipe. Someone told me it slows down the wear factor on the point and the coupling joints. It would also be easier to pull it out should it need service. Is this a good idea and how is it done? Thank you.