Replacing tub with walk in shower

Users who are viewing this thread

Flyin

New Member
Messages
1
Reaction score
0
Points
1
Location
St. Louis
I have the ole 1"1/2 tub drain and code is 2" for a shower only. I ran across a post sometime back where someone stated the IAPMO changed and if replacing an existing tub with shower the existing 1"1/2 drain was now acceptable. And as long it is NOT new construction (hence the existing part).
I would love to change it to 2" but there is a finished ceiling underneath and it would require removing a whole lot of it to go all the way to stack.

Can someone point me to where it states this in the IAPMO I cannot find it.

Thanks.
 