I am doing a bathroom remodel of my 1979 home and am not sure if I should be looking to make changes to the venting of my bathroom.
The the 3" main stack runs up one corner of the bathroom. From that stack, a 1-1/2" branch splits off below the floor and runs a total of 8' to a P-trap for a shower/tub. Above the floor, a 1-1/2" branch splits off and drains a total of four sinks (2 double sink vanities, back-to-back).
Do I need to make any changes while the room is ripped apart?
I've attached a quick sketch of the situation for reference.
It would next to impossible to circuit a vent back to the stack in either case, but could probably go up through the roof at the end of each run if that is required.
Thanks!
The the 3" main stack runs up one corner of the bathroom. From that stack, a 1-1/2" branch splits off below the floor and runs a total of 8' to a P-trap for a shower/tub. Above the floor, a 1-1/2" branch splits off and drains a total of four sinks (2 double sink vanities, back-to-back).
Do I need to make any changes while the room is ripped apart?
I've attached a quick sketch of the situation for reference.
It would next to impossible to circuit a vent back to the stack in either case, but could probably go up through the roof at the end of each run if that is required.
Thanks!