Hello,
I'm trying to design my DWV system for a toilet that's recently been relocated. I don't have the space to just drop it vertically, then do a long 90 to then run and reach the horizontal stack. What I was thinking, is to do a 45 after the first few inches coming off the toilet, then immediately another 45 before connecting to the 90. Would this allowed?
I'm trying to design my DWV system for a toilet that's recently been relocated. I don't have the space to just drop it vertically, then do a long 90 to then run and reach the horizontal stack. What I was thinking, is to do a 45 after the first few inches coming off the toilet, then immediately another 45 before connecting to the 90. Would this allowed?