JohnfrWhipple
BATHROOM DESIGN & BUILD
Decks over living space
Last edited:
You will never get it ...... the industry doesn't address specifics , just general recommendations .
Addressing specifics it is what we do daily ....don't need to or have time to explain it . If you want to participate to a thread where nothing is asked , just presented , you or any member can easily ask any question relevant to the subject .
Stop doing the know it all S man . Going to seminars from time to time will not even touch a .000005% of doing a hands on project .
I am not upset. I just state FACTS.
You are a mess.
Me too... I am big enough to admit it tho.
I'm shattered today. Yesterday was a long day. Did not start till past ten and then got to work and realize I had no slurry coat. Had to double back to Centanii and did not finish this shower till after eight at night.
Roberto any tips on deck mud mixing? I found the 2-3 litter spec on the 3701 much to hard to work with. To dry of a mix for the drill. I started out with 3.6 litters of water and mixed 80% of a bag and got that loose and mixed. Then I dumped out this slurry into two smaller 3 gallon buckets and the remaining 3701 and a hair more from a spare bag to get the drier mix.
Worked well but a lot of drilling time. Must have spend a total of 45 minutes alone yesterday just spinning mud. The bag shows a concrete mixer in the instructions. Too bad I don't have one....