I am running the supply lines in my new house and cannot decide which way to to run my lines. I am thinking about doing it one of the following ways.
a) Use a manifold system that would run a 1/2" line to each room that requires plumbing except for bathrooms would get a 3/4 line instead. From the room I would tee off to that rooms fixtures.
b) same as above but instead of the 3/4 I would run a separate 1/2 in to the tub/showers.
c) Run it in a branch system similar to how copper would be run with 3/4 trunk lines and branch of to the rooms like that.
What are everyones thoughts about what is the best way and the pros and cons of the above.
Thanks.
a) Use a manifold system that would run a 1/2" line to each room that requires plumbing except for bathrooms would get a 3/4 line instead. From the room I would tee off to that rooms fixtures.
b) same as above but instead of the 3/4 I would run a separate 1/2 in to the tub/showers.
c) Run it in a branch system similar to how copper would be run with 3/4 trunk lines and branch of to the rooms like that.
What are everyones thoughts about what is the best way and the pros and cons of the above.
Thanks.