Shadyskater05
New Member
Good Evening
I am looking to add a bathroom downstairs. I have a CI existing line which I exposed below concrete. The deepest part is roughly 5 1/5 from top of concrete. I will be raising the floor due to the pad sloping too much. I’m imagine I can make multiple tie ins or run another sewer line parallel and then tiying in one location. I will only have 1 vent for this bathroom. The shower drain is 71/2” to subfloor and WC is 10 1/2”. Let me know your thoughts.
I am looking to add a bathroom downstairs. I have a CI existing line which I exposed below concrete. The deepest part is roughly 5 1/5 from top of concrete. I will be raising the floor due to the pad sloping too much. I’m imagine I can make multiple tie ins or run another sewer line parallel and then tiying in one location. I will only have 1 vent for this bathroom. The shower drain is 71/2” to subfloor and WC is 10 1/2”. Let me know your thoughts.