Basically, someone glued in the toilet seal to the house plumbing. The foundation shifted (presumably) and the house plumbing (PVC) split into 2 pieces. The split is about 6" deep into the slab foundation. Part of the split includes the very top section of a 90 deg elbow and extends through that...