For 70' my iron natural gas piping is oversized, mostly 1-1/4" with 1" at the end. I want to extend 5' to a gas log burner which wants 110-130K btus. But the route is super tight (width-wise, no tight bends), and 1/2" CSST is the only reasonable logistical choice. Per sizing/length schedule I...