In Ky, the vent has to increase to 3" 18" before it penetrates the roof and must protrude the roof a minimum of 12".
The pipe need to extend higher than 12" if the pitch of the roof is steep in my opinion.
The reason for 3" minimum is to prevent frost-over.





Reply With Quote

Bookmarks