Sorry for the lousy artwork. Dwg shows bathroom plumbing that is failing & needs to be replaced. I want to replace the lead closet bend with ABS. the bend has a vent entering the side of it. My bottom drawing shows how I thought I would do this adding a cleanout & connecting the vent differently. Would this work, or should the vent go downstream from the toilet connection? TIA