I will be installing 1200' of new waterline to gain access to city water after my well has failed.
My question are:
1. Given such a long run, can I install a few cut offs in the line for leak testing in the future?
I planned to add a large pipe down to the valve and insulate the hole.
If I have a leak I can then shut down valves and narrow my digging requirements.
2. Using polyethylene, should I pay extra and double sleeve the waterline...This is what we do in rocky areas, but what about the whole length?