7echo
New Member
It is about 1 1/8" from tile deck to top of pipe, and 1 5/8" from tile deck to the slab right around the pipe. This is the result of a bad remodel 15 years ago. I want to fill in the area so that it supports the flange properly and adds material for the flange bolts to anchor. What should I use to fill this area? What bolts should I use to anchor the flange in the new material?
Thanks for comments!
Thanks for comments!