I have a cast iron tub in my end story (left side drain) bath room. The tub is not leveled correctly. What I mean by that is, it slopes apx 1/4"' to 3/8 '' away from the wall so during shower the splashed water from the top left side over flows on to the tile and down into the celling. This has caused my 3/4'' playwood floor to get dry rot slightly. fortunatly it's on the left side of the tub and not much under the tub. I did cut the celling underneath and took out a small 4''X 4'' of rotted plywood (not under the tub). Although I had installed a shower door and a curtain, the water still seeped thru (due to poor caulking) on the floor.
I would like to know what would you recommend so that I don't have this dripping from the top of the tub. It seems like the tub was not installed leveled. How would I go around leveling a 300 Ib tub. Do I need to remove the tub and replace the 3/4 plywood on which it rests?
Please advise
Shaney
I would like to know what would you recommend so that I don't have this dripping from the top of the tub. It seems like the tub was not installed leveled. How would I go around leveling a 300 Ib tub. Do I need to remove the tub and replace the 3/4 plywood on which it rests?
Please advise
Shaney