On new construction or additions (wood frame):
roll joists
rough in plumbing below floor, stubbing up waste water and gas, test
Lay subfloor,
water and gas, test
On slab jobs:
Set forms
Run waste, test
Frame walls and roof, sheet roof
Top out waste, run water and gas, test,
No water in slab, (now that could start an argument)