I would get rid of the raised floor idea and break the slab for the waste line. As far as supply lines they can be routed through walls or attics although in climates where freezing could be a problem attics and outside walls should be avoided. Copper, CPVC, or, PEX is the materials for supply lines, not galvanized!





Reply With Quote

Bookmarks