looknohands
New Member
I'm remodeling our half-bath into a full bathroom, moving the toilet and sink to a different location, and building a tiled shower.
I posted my PVC rough-in plan here a few days ago: https://terrylove.com/forums/showthread.php?t=1731
Worked out Plan B today. Still have to extend the 3" drain to the toilet location. Another thing I have to do, that wasn't on the plan, is build the shower drain, which will hook up to a 2" drain outside the photo.
So here's the execution: http://www.looknohands.com/rough-in-part-1.jpg.
This is my first plumbing job, so go easy on me ;-)
- Erik
I posted my PVC rough-in plan here a few days ago: https://terrylove.com/forums/showthread.php?t=1731
Worked out Plan B today. Still have to extend the 3" drain to the toilet location. Another thing I have to do, that wasn't on the plan, is build the shower drain, which will hook up to a 2" drain outside the photo.
So here's the execution: http://www.looknohands.com/rough-in-part-1.jpg.
This is my first plumbing job, so go easy on me ;-)
- Erik