I have to finish out a house next week and the homeowners had a “plumber†come in and look at the house.
1- They don’t like that the house has (2) 2†vents in the roof. The plumber is telling them that I should have done it in one vent.
2- The plumber has talked them in to saving money by getting the cheap big orange water closets, tubs, sinks, and all the futures.
I had to special order everything they wanted for the house. One of the tubs they got will not fit the hole. The water closets have the wrong off set. The sinks are smaller then the holes in the counter tops.
I talked to the GC and told him that I will never get rid of the stuff they ordered and that it will be a thousand or two to ship it all back and for the restocking fees. I have told him all of this and I have not gotten a replay back form him yet. I did show him all of the good legal stuff in the contract that they singed. I also told him that if I don’t get it done next week it will be 2 or 3 weeks before I get back out there.
What would you do?
1- They don’t like that the house has (2) 2†vents in the roof. The plumber is telling them that I should have done it in one vent.
2- The plumber has talked them in to saving money by getting the cheap big orange water closets, tubs, sinks, and all the futures.
I had to special order everything they wanted for the house. One of the tubs they got will not fit the hole. The water closets have the wrong off set. The sinks are smaller then the holes in the counter tops.
I talked to the GC and told him that I will never get rid of the stuff they ordered and that it will be a thousand or two to ship it all back and for the restocking fees. I have told him all of this and I have not gotten a replay back form him yet. I did show him all of the good legal stuff in the contract that they singed. I also told him that if I don’t get it done next week it will be 2 or 3 weeks before I get back out there.
What would you do?