I am trying to finish a project which will not be inspected, but want to do all work to code.
The service is to a pedestal (200A).
Inside the pedestal is a 175A breaker that serves a subpanel on the exterior of the residence. Also inside the pedestal is a ground rod and a supplemental horizontal rod both attached to the ground bar.
Questions:
At the subpanel am I required to do any grounding/bonding?
What about the r-bar sticking out of the slab?
What about the copper piping 50 feet away in the bath and kitchen which never enters the ground (changes to PVC).
TIA
Bob
The service is to a pedestal (200A).
Inside the pedestal is a 175A breaker that serves a subpanel on the exterior of the residence. Also inside the pedestal is a ground rod and a supplemental horizontal rod both attached to the ground bar.
Questions:
At the subpanel am I required to do any grounding/bonding?
What about the r-bar sticking out of the slab?
What about the copper piping 50 feet away in the bath and kitchen which never enters the ground (changes to PVC).
TIA
Bob