sbaitso
New Member
- Messages
- 19
- Reaction score
- 0
- Points
- 0
I'm considering replacing the old galvanized pipe in my basement with copper. Since I've never sweated pipes before, I'm doing alot of research and reading on the subject before I begin, and many questions are starting to come up. This forum has been a great source of info.
The house was built in the 1920's and a mix of copper and galvanized pipe is running through the house currently. Luckily all of the upstairs fixtures have 1/2" copper running to them. The basement is another story. Basically the current setup is this:
1. Lead Supply Main into house (2" maybe, never really measured)
2. Shutoff
3. 5/8" Water Meter
4. Shutoff
5. Small length of 1/2" copper tubing
6. 3/4" Pressure Reduction Valve
7. Another small length of 1/2" Copper to join to existing galvanized line
8. Then galvanized pipe runs the length of the basement, where it T's off to the hot water heater (where it is again joined to copper, it was recently replaced by previous owners) and the 1/2" copper running to the upstairs fixtures.
Why the previous owners simply didn't replace all the galvanized pipe is beyond me.
I would assume that for a one bathroom house like mine, using at least 3/4" pipe would be best, but are the 1/2" inch fittings that connnect the meter and the pressure reduction valve too small? with a 5/8" meter, would I even see a benefit to using 3/4" copper? could I get away with using 1/2" from the meter to feed the house adequetly?
My thought is that if I am going to spend the money on the materials, I might as well get it right the first time, but I'm not sure I have the expertise to mess around with the pipe around the meter and pressure reduction valve, as they are kinda crammed into a small small spot.
I'm begining to wonder if perhaps I should consider paying a professional, but would love to do it myself.
thanks for any advice
The house was built in the 1920's and a mix of copper and galvanized pipe is running through the house currently. Luckily all of the upstairs fixtures have 1/2" copper running to them. The basement is another story. Basically the current setup is this:
1. Lead Supply Main into house (2" maybe, never really measured)
2. Shutoff
3. 5/8" Water Meter
4. Shutoff
5. Small length of 1/2" copper tubing
6. 3/4" Pressure Reduction Valve
7. Another small length of 1/2" Copper to join to existing galvanized line
8. Then galvanized pipe runs the length of the basement, where it T's off to the hot water heater (where it is again joined to copper, it was recently replaced by previous owners) and the 1/2" copper running to the upstairs fixtures.
Why the previous owners simply didn't replace all the galvanized pipe is beyond me.
I would assume that for a one bathroom house like mine, using at least 3/4" pipe would be best, but are the 1/2" inch fittings that connnect the meter and the pressure reduction valve too small? with a 5/8" meter, would I even see a benefit to using 3/4" copper? could I get away with using 1/2" from the meter to feed the house adequetly?
My thought is that if I am going to spend the money on the materials, I might as well get it right the first time, but I'm not sure I have the expertise to mess around with the pipe around the meter and pressure reduction valve, as they are kinda crammed into a small small spot.
I'm begining to wonder if perhaps I should consider paying a professional, but would love to do it myself.
thanks for any advice