I'm completing a basement bathroom remodel and I miscalculated the height of the floor.
The drain is set in concrete and the bottom of my toilet flange rests about 1/8" above the finished floor. I have not cemented (pvc) the flange into the drain, so I figure I have 2 options:
1) Cut a smidge off the bottom of the flange so it fits flush to the floor.
2) Shim the underside of the flange so it's supported.
Which option is better?
Digging up the drain is not really an option at this point...
Any help appreeciated.
The drain is set in concrete and the bottom of my toilet flange rests about 1/8" above the finished floor. I have not cemented (pvc) the flange into the drain, so I figure I have 2 options:
1) Cut a smidge off the bottom of the flange so it fits flush to the floor.
2) Shim the underside of the flange so it's supported.
Which option is better?
Digging up the drain is not really an option at this point...
Any help appreeciated.