karlpenney
New Member
- Messages
- 6
- Reaction score
- 0
- Points
- 0
I'm installing a prefab acrylic shower unit (one piece) in the basement. The ABS trap is already roughed in and I have a two piece ABS drain (see http://www.johnlschultz.com/site/products/products-more.asp?part=133-113). The body of the drain solvent welds to the drain pipe and the strainer screws in from the inside of the shower. I am planning to dry fit and measure everything (several times) before gluing it all up. Is there any other trick to getting it all aligned properly before setting the shower unit in place?