Hello All,
I am new to the forum and this is my first post. I am in the process of remodeling the master bath in my home which is on the second floor. I have attached the pic. of the old layout and the new layout (both floor plan and vanity plan). I would like to do as much of this as I can. I am trying to avoid any mistakes before it is too late. Basically I am adding a drop in corner whirlpool (MTI-26) and replacing the old shower/tub combo with a kerdi base walk in shower. As the Old layout pic shows there is currently a 1-1/4" drain which ties into the 4" drain for the toilet. My questions are:
1. Can I tie the drain for the new tub into the 1-1/4" as shown in the new layout.
2. What do I stub out of the sub-floor? (I not sure how to make the final connections to the drains for the tub and shower drain one the sub-floor is down.
3. Also if anyone sees any problems with the new layout please feel free to chime in.
I am currently at work and will take pictures of the current status of the project which will show the plumbing under the sub-floor.
Thank you in advance
I am new to the forum and this is my first post. I am in the process of remodeling the master bath in my home which is on the second floor. I have attached the pic. of the old layout and the new layout (both floor plan and vanity plan). I would like to do as much of this as I can. I am trying to avoid any mistakes before it is too late. Basically I am adding a drop in corner whirlpool (MTI-26) and replacing the old shower/tub combo with a kerdi base walk in shower. As the Old layout pic shows there is currently a 1-1/4" drain which ties into the 4" drain for the toilet. My questions are:
1. Can I tie the drain for the new tub into the 1-1/4" as shown in the new layout.
2. What do I stub out of the sub-floor? (I not sure how to make the final connections to the drains for the tub and shower drain one the sub-floor is down.
3. Also if anyone sees any problems with the new layout please feel free to chime in.
I am currently at work and will take pictures of the current status of the project which will show the plumbing under the sub-floor.
Thank you in advance