Looking for some help/advise regarding putting in my own well. Here is the story. About a year or so ago, in the middle of a pretty dry spell, I used an auger post hole digger to see if I could find water on my lot. I went down about nine or 10 feet, ran into somewhat coarse sand, and hit water. I left it at that, but checked the hole periodically off and on and there was always water in the bottom. I never did any more with it.
Fast forward to today. I finally got back around to checking my would be well. Needless to say there is no water in the bottom, but from what I could tell, I have a pretty good start on my own personal sink hole. Looking down from the top, I have a hole about two feet deep. From there, there is an open cavern about a foot deep. I am unable to tell how big in diameter the cavern may be. From there, I have soil that has evidently caved in and filled in my “wellâ€. I took a 10’ piece of ¾†PVC and pushed it through the soil and pulled it back out. The “plug†removed once again showed my coarse sand, but about nine feet down, my PVC would not go any further.
Where do I go from here? As close to the top of my hole that the ground has caved in, is it safe to assume that at one point the water level was within three feet of the surface? I do have a sump “dug in†in my crawlspace. The majority of the time it is dry, but spring/fall, I do pump water out. I doubt I could re-auger a hole back down into my well and set a point, but given the fact I could push PVC about nine feet down, I may be able to drive a point no problem.
At this time, I only plan on running one sprinkler on the end of the hose and possibly some drip irrigation, but given the amount of water I get into and can produce, I may eventually go with an irrigation system. I live in the city and don’t have a golf course size lot by any means, but just want to be able to water without hiking my bill to $300.00+ every quarter. My original plans were to try to install a 10 slot 2†x 10’ PVC point, and back when I first started the project, probably could have sunk this with no problem. Now with the “cave-inâ€, I am not sure where to go.
Thanks in advance for any advise you may be able to provide.
Fast forward to today. I finally got back around to checking my would be well. Needless to say there is no water in the bottom, but from what I could tell, I have a pretty good start on my own personal sink hole. Looking down from the top, I have a hole about two feet deep. From there, there is an open cavern about a foot deep. I am unable to tell how big in diameter the cavern may be. From there, I have soil that has evidently caved in and filled in my “wellâ€. I took a 10’ piece of ¾†PVC and pushed it through the soil and pulled it back out. The “plug†removed once again showed my coarse sand, but about nine feet down, my PVC would not go any further.
Where do I go from here? As close to the top of my hole that the ground has caved in, is it safe to assume that at one point the water level was within three feet of the surface? I do have a sump “dug in†in my crawlspace. The majority of the time it is dry, but spring/fall, I do pump water out. I doubt I could re-auger a hole back down into my well and set a point, but given the fact I could push PVC about nine feet down, I may be able to drive a point no problem.
At this time, I only plan on running one sprinkler on the end of the hose and possibly some drip irrigation, but given the amount of water I get into and can produce, I may eventually go with an irrigation system. I live in the city and don’t have a golf course size lot by any means, but just want to be able to water without hiking my bill to $300.00+ every quarter. My original plans were to try to install a 10 slot 2†x 10’ PVC point, and back when I first started the project, probably could have sunk this with no problem. Now with the “cave-inâ€, I am not sure where to go.
Thanks in advance for any advise you may be able to provide.