I am installing a set of stairs and the main vent stack (3") is in a bad spot . I need to move it over 7'/8' from its present location... so, that would be a horizontal run that can be pitched. And then up in the attic it would have a 90 and do a pitched horizontal run same distance back to the original termination out of the roof (metal roof). Can I do that? I know that the code says it needs to be the most direct path, which this is not...
Thanks!
 

hj

Master Plumber
Messages
33,608
Reaction score
1,047
Points
113
Location
Cave Creek, Arizona
Website
www.terrylove.com
I do not know of any code which specifies it must be "the most direct path". If you do it correctly, there is no problem with it.