Hiperco
Member
Hi all. I'm working on my remodeling my bathroom and I've been pestering the kind folks over at the John Bridge forums with tile questions for a while now, so I thought I'd give them a break and stop by here for a bit
I need to move my shower drain, strangely it was located at the front of the previous showing. I will need to route it through a joist to get it located where it needs to be (more toward the center of the opening, toward the left in the bottom picture). I should be ok structurally, these are 2x10's and I'm not in the middle third of the joist. As luck would have it one of the supply lines is totally in the way so I need to re-route it as well. I think my path forward is clear, but I wanted to see if anyone has any comments or concerns before I start cutting, boring, etc. Thanks!
I need to move my shower drain, strangely it was located at the front of the previous showing. I will need to route it through a joist to get it located where it needs to be (more toward the center of the opening, toward the left in the bottom picture). I should be ok structurally, these are 2x10's and I'm not in the middle third of the joist. As luck would have it one of the supply lines is totally in the way so I need to re-route it as well. I think my path forward is clear, but I wanted to see if anyone has any comments or concerns before I start cutting, boring, etc. Thanks!