The plan for a new house has a basement bathroom with a 22-foot run to the closest place the required ejector pit can be.
From there it's 9 feet up and 8 feet over for the 2 inch line from the pit to where it will Y into the sewer line out.
Are these run lengths too long?
From there it's 9 feet up and 8 feet over for the 2 inch line from the pit to where it will Y into the sewer line out.
Are these run lengths too long?